Mitsubishi RV-1A-2AJ Series INSTRUCTION MANUAL PDF

MITSUBISHI Mitsubishi Industrial Robot RV-1A/2AJ Series
INSTRUCTION MANUAL ROBOT ARM SETUP & MAINTENANCE

All teaching work must be carried out by an operator who has received special training.
(This also applies to maintenance work with the power source turned ON.)
→ Enforcement of safety training

For teaching work, prepare a work plan related to the methods and procedures of oper-
ating the robot, and to the measures to be taken when an error occurs or when restart-
ing. Carry out work following this plan. (This also applies to maintenance work with the
power source turned ON.)
→ Preparation of work plan

Prepare a device that allows operation to be stopped immediately during teaching work.
(This also applies to maintenance work with the power source turned ON.)
→ Setting of emergency stop switch

During teaching work, place a sign indicating that teaching work is in progress on the
start switch, etc. (This also applies to maintenance work with the power source turned
ON.)
→ Indication of teaching work in progress

Provide a fence or enclosure during operation to prevent contact of the operator and
robot.
→ Installation of safety fence

Establish a set signaling method to the related operators for starting work, and follow
this method.
→ Signaling of operation start

As a principle turn the power OFF during maintenance work. Place a sign indicating that
maintenance work is in progress on the start switch, etc.
→ Indication of maintenance work in progress

Before starting work, inspect the robot, emergency stop switch and other related
devices, etc., and confirm that there are no errors.
→ Inspection before starting work

Download Mitsubishi RV-1A-2AJ Series INSTRUCTION MANUAL PDF
Get the file Download here | PDF-HOME